        高低壓成套設備安裝需要注意哪些事項?

        發布時間:2023-07-24 來源:http://m.zhaowenjy.com/ 瀏覽量:

        1.安裝時,配電柜應按照施工圖的布置順序放置在基礎鋼筋上。單獨的機柜可調節機柜表面和側面的垂直度整個問題可以通過添加墊片來解決,但不超過三個墊片,并且焊接牢固。放置一排機柜中的每個單元后,調整PDC的水平度和面板偏差。應進行調整以滿足施工規范的要求。
        During installation, the distribution cabinet should be placed on the foundation steel bars in the order shown in the construction drawings. The verticality of the surface and sides of the individual cabinet can be adjusted. The entire problem can be solved by adding gaskets, but not more than three gaskets, and the welding is firm. After placing each unit in a row of cabinets, adjust the levelness and panel deviation of the PDC. Adjustments should be made to meet the requirements of construction specifications.
        2,安裝應嵌入盒子中,安裝面板應與墻壁齊平;壁掛式配電柜可以通過膨脹螺栓固定在墻上,但空心磚或燕尾螺栓應預埋在砌塊墻上或用方頭螺栓固定。調整PDC后,在PDC主體上安裝螺栓并擰緊鋼筋。
        2. The installation should be embedded in the box, and the installation panel should be flush with the wall; Wall mounted distribution cabinet can be fixed on the wall by expansion bolt, but Concrete masonry unit or dovetail bolt shall be embedded on the block wall or fixed by square head bolt. After adjusting the PDC, install bolts on the PDC body and tighten the steel bars.
        3.高低壓成套裝置接地注意事項如下:每個PDC都連接到基礎鋼上。銅電纜可用于將PDC中的PE排連接到接地螺栓。根據連接情況,必須添加彈簧墊圈以防止松動。每個柜門應使用銅編織線牢固地連接到PE排。
        濟南機箱機柜
        3. The grounding precautions for the high and low voltage complete equipment are as follows: each PDC is connected to the foundation steel. Copper cables can be used to connect the PE busbar in the PDC to the grounding bolt. According to the connection situation, spring washers must be added to prevent loosening. Each cabinet door should be securely connected to the PE busbar using copper braided wire.
        4.將配電柜頂部連接到母線上,并注意按要求擰緊母線配套扳手,接觸面應涂上中性凡士林。在配電柜之間連接母線時,注意母線是否離其他設備或外殼太近,并注意正確的相位。
        4. Connect the top of the power distribution cabinet to the bus, and pay attention to tightening the bus matching wrench as required. The contact surface should be coated with neutral Vaseline. When connecting busbars between distribution cabinets, pay attention to whether the busbars are too close to other equipment or enclosures, and pay attention to the correct phase.
        5.控制線校準后,將每條芯線形成一個圓圈,并用鍍鋅螺釘、吊環和彈簧墊將其連接到每個接線板上。通常,條帶的每側各有一根,每個端子有一根電線,再Z兩根電線,然后在兩根電線之間加一個吊環。多股電線應鍍錫,不得斷裂。
        After the control wire is calibrated, form a circle for each core wire and connect it to each terminal block using galvanized screws, lifting rings, and spring pads. Usually, there is one wire on each side of the strip, one wire at each terminal, and then two wires, and a lifting ring is added between the two wires. Multiple wires should be tinned and not broken.
        6、控制電路檢查:檢查電路是否因運輸等因素而松動,并擰緊,檢查電氣元件是否損壞。
        6. Control circuit inspection: Check whether the circuit is loose due to transportation and other factors, tighten it, and check whether the electrical components are damaged.
        首頁首頁 產品產品 電話電話 置頂置頂
        主站蜘蛛池模板: 另类 专区 欧美 制服丝袜| 无码av孕妇专区| 人妻少妇被猛烈进入中文字 | 国产成人亚洲精品狼色在线| 欧亚乱色一区二区三区| 国产精品无码久久四虎| 亚洲国产精品无码久久电影| 实拍女处破www免费看| 久久厕所精品国产精品亚洲| 亚洲乱女色熟一区二区三区 | 77777_亚洲午夜久久多人| bbwbbwbbw白嫩| 日韩无码乱了www亚洲无码视频| 亚洲天堂2017无码中文| 久久精品道一区二区三区| 日本不卡的一区二区三区| 120秒免费观看视频| 福利无遮挡喷水高潮| 乱码中文字幕| 黑色丝袜国产精品| 97精品国产高清自在线看超| 99精品电影一区二区免费看| 免费看久久精品99| 欧美国产日韩在线v观看综合| 亚洲日韩AV无码一区二区三区人| 99久久久无码国产精品9| 日韩人妻无码一区二区三区 | 欧美成人精品欧美一级乱黄| 男女高潮喷水在线观看| 老妇毛片久久久久久久久| 99精品视频九九精品视频| 亚洲精品动漫| 国产亚洲欧美日韩在线一区二区三区| 久久久久香蕉国产线看观看伊| 欧美成人精品欧美一级乱黄| 毛片免费视频在线观看| 成人网站在线进入爽爽爽| 爱性久久久久久久久| 国产精品av在线免费| 18禁免费观看网站| 无码丰满熟妇juliaann与黑人|